Changes between Version 4 and Version 5 of Status


Ignore:
Timestamp:
Apr 24, 2008, 12:16:24 PM (16 years ago)
Author:
gaew
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Status

    v4 v5  
    88
    99= Update of operational status for data collection =
    10 
     10Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391)
    1111== 22nd April 2008 ==
    1212''Following the fitting of a loaned engine the NERC ARSF aircraft has resumed support for UK remote sensing. During the first two weeks in May data collection time will be shared between the support of UK remote sensing and participation in an International experiment in support of science (EUCAARI - NL08/01). The Cambridge LiDAR should be available in the NERC aircraft at the end of May, just after the aircraft is refitted with the repaired engine.''
    1313
    14 == 20th February 2008 ==
    15 ''Following
     14== 20th March 2008 ==
     15''The NERC ARSF aircraft is presently in Germany. It is undergoing maintenance on its engines and will undergo CAA certification. Following its return to the UK it will be engaged in the support of Atmospheric science. Support for UK remote sensing will resume in mid. April. ''
    1616
    17 Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391)
     17